course:congress_setup:congress_preparation:registration_hall:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
course:congress_setup:congress_preparation:registration_hall:start [2017/03/06 13:38] don.leecourse:congress_setup:congress_preparation:registration_hall:start [2018/12/16 09:17] (current) – ↷ Links adapted because of a move operation don.lee
Line 17: Line 17:
  
 ^ Item ^ Responsible ^ Remarks ^ ^ Item ^ Responsible ^ Remarks ^
-| VLAN | Venue | |+| VLAN | Venue | VLAN A |
 | Gigabit Ethernet Switch | either venue or Local IT | | | Gigabit Ethernet Switch | either venue or Local IT | |
 | Cat5E cabling | Local IT | | | Cat5E cabling | Local IT | |
-| Helper | PCO | work in registration hall |+| Helper | PCO | work in registration hall, read [[course:congress_setup:operations_manual:registration:|Registration Operation Manual]] for details |
 | Wi-Fi AP | Questwork | | | Wi-Fi AP | Questwork | |
 +| Registration counter equipment | Questwork | congress app, scanner, badge printer | 
 +
  
  
Line 31: Line 32:
   * The network switch will be connected to VLAN A.   * The network switch will be connected to VLAN A.
  
-===== Wifi =====+===== Public & Private Wi-Fi =====
  
   * A private Wi-Fi will be setup and connected to the network switch.   * A private Wi-Fi will be setup and connected to the network switch.
  • course/congress_setup/congress_preparation/registration_hall/start.1488778706.txt.gz
  • Last modified: 2017/03/06 13:38
  • by don.lee