Differences
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
course:congress_setup:congress_preparation:speaker_ready_room:start [2017/03/06 13:45] – created don.lee | course:congress_setup:congress_preparation:speaker_ready_room:start [2017/03/06 13:56] (current) – [Logistics] don.lee | ||
---|---|---|---|
Line 23: | Line 23: | ||
| Helper | PCO | work in speaker ready room, read [[course: | | Helper | PCO | work in speaker ready room, read [[course: | ||
| Speaker Ready Room System | Questwork | | | | Speaker Ready Room System | Questwork | | | ||
+ | | USB drive | Questwork | backup plan in case network is down | | ||
+ | | Video adapters | Questwork | for speakers using own laptop | | ||
Line 29: | Line 30: | ||
* All network switch and cabling must be Gigabit ethernet. | * All network switch and cabling must be Gigabit ethernet. | ||
- | * The network switch will be connected to VLAN A. | + | * The network switch will be connected to VLAN B. |
+ | * All computers must be connected to the switch via wired cabling. | ||
+ | * Provides 3 additional cables for Speaker Ready Room server and NAS on top of the total number of computers in Speaker Ready Room. | ||
===== Computer ===== | ===== Computer ===== | ||
Line 39: | Line 41: | ||
+ | ^ ^ PC ^ Mac ^ | ||
+ | | CPU | Intel i5 CPU or above || | ||
+ | | Memory | 8GB | 4GB | |