Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| course:congress_setup:venue_preparation:speaker_ready_room:start [2025/10/19 20:44] – removed - external edit (Unknown date) 127.0.0.1 | course:congress_setup:venue_preparation:speaker_ready_room:start [2025/10/19 20:44] (current) – ↷ Links adapted because of a move operation don.lee | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | ====== Speaker Ready Room Preparation ====== | ||
| + | |||
| + | ===== Overview ===== | ||
| + | |||
| + | The speaker ready room will be connect to [[course: | ||
| + | |||
| + | ===== Involved Parties ===== | ||
| + | |||
| + | ^ Company ^ Remarks ^ | ||
| + | | Venue | provides network infrastructure, | ||
| + | | PCO | provides helpers to work in Speaker Ready Room | | ||
| + | | Local IT | provides switch & cabling, computers | | ||
| + | | Questwork | provides Speaker Ready Room System | | ||
| + | |||
| + | ===== Logistics ===== | ||
| + | |||
| + | ^ Item ^ Responsible ^ Remarks ^ | ||
| + | | VLAN | Venue | VLAN B | | ||
| + | | Gigabit Ethernet Switch | either venue or Local IT | | | ||
| + | | Cat5E cabling | Local IT | | | ||
| + | | Technician | Local IT | work in speaker ready room, read [[course: | ||
| + | | Helper | PCO | work in speaker ready room, read [[course: | ||
| + | | Speaker Ready Room System | Questwork | | | ||
| + | | USB drive | Questwork | backup plan in case network is down | | ||
| + | | Video adapters | Questwork | for speakers using own laptop | | ||
| + | |||
| + | |||
| + | ===== Switch & Cabling ===== | ||
| + | |||
| + | * All network switch and cabling must be Gigabit ethernet. | ||
| + | * The network switch will be connected to VLAN B. | ||
| + | * All computers must be connected to the switch via wired cabling. | ||
| + | * Provides 3 additional cables for Speaker Ready Room server and NAS on top of the total number of computers in Speaker Ready Room. | ||
| + | ===== Computer ===== | ||
| + | |||
| + | There are two types of computer hardware. One for uploading and downloading presentation files. And the second one for video conversion and editing. | ||
| + | |||
| + | * All computer hardware and software must be the same for uploading and downloading in Speaker Ready Room and Session Rooms. | ||
| + | * More powerful computer hardware will be provided for video conversion and editing. | ||
| + | |||
| + | |||
| + | ^ ^ PC ^ Mac ^ | ||
| + | | CPU | Intel i5 CPU or above || | ||
| + | | Memory | 8GB | 4GB | | ||